Tekirdağ - Muratlı Railway Track Signalization and Telecommunication System Facility, Cerkezkoy Control Center Renovation

The project is the railway signal and traffic control systems installation on Tekirdag – Muratli line together with Automatic Train Stopping system.

The systems complying to international standards in order to maintain the railway traffic in a safe and effective manner with the trains running at the speed of up to 160km/h.

The renewal of the command center in Halkali – Kapikule line by adding the existing TCDD Control and Command Center and the renewal of trackside control points two way data and voice communication systems that belong to Halkali – Kapikule, Pehlivankoy – Hudut, Muratli – Tekirdag lines, supplying auxiliary system/device, equipment and sub-systems for the installed signalling systems will be a part of the project.