The Installation Of Electrification Systems On Kayseri – Adana Railway Track, Division I And Division IV

The Project Phase-1 is to complete 135km catenary line, 112km single-track main line and 9 stations located on Bogazkopru – Nigde line.

The Project Phase-IV is to complete 210km catenary line, 5km single-track variant line and 67km double-track main line, 7 stations located on Mersin – Adana line. The installation of catenary systems in Mersin – Adana Stations, Tirmil – Yenice Stations and in Tarsus Station will be provided as part of the project.

The construction drawings design, provide workers and equipment complying to international standards together with a catenary two-direction maintenance car that is able to run forward and reverse at the minimum speed of 90kmp/h to be used in catenary inspection/maintenance centers will be a part of the project phases.